Register Login
DioEnglish.com Back to Home

Will-Cheng's Space https://www.dioenglish.com/?114617 [Favorite] [Copy] [Shares] [RSS]

Blogs

It’s gonna be a really tough day for me

132 reads2026-10-13 18:53 |Personal Category:Job

 

 It’s gonna be a really tough day for me because assembly production starts today. We do have a production supervisor, but he can’t come back until the 15th. That means I have to cover his job. It’s gonna be a rough day. I don’t like being on the production line, since I’m a project manager.
 
Yeah, I need to handle everything on site. I’m covering the production supervisor’s job. His responsibilities are running the production line, managing production efficiency, quality control, and material flow — basically everything related to the assembly line. All of that falls on me now. I won’t even have time for my project management work. I have to stay on the production line the whole time.
 
Not really. Even once the supervisor comes back, I still need to go to the production line from time to time. You know, he’s only part-time. He’s not a full-time employee of ours. So he’s not 100% reliable. That means I still need to head down to the line to check things regularly. So yeah, this becomes part of my regular duties. I’m not in production, and my role isn’t directly related to production, but I still need to go there to keep an eye on things.
 
No. Once the production supervisor comes back, I’ll only need to visit the production line for an hour or two each day. That’s just a couple of hours. He’s our temporary employee. We don’t run the production line every day. We simply don’t get enough orders to keep the line operating daily, so we can’t afford to hire a full-time production supervisor. That’s why we went with a temp. This is our current situation.
 
Yeah, for sure. It’s our company’s goal to grow our order volume down the line, so we can hire a permanent, full-time supervisor.
 
Originally, our company was just a design and development firm. Then our boss realized we needed to add production. Design and development work tends to be one-off; there aren’t many repeat orders. Only production can keep the business steady and bring in consistent revenue from reorders. That’s a long-term business model.
 
So it’s not like we completely switched over. We do both design & development, plus production. That’s our new growth strategy. Right now though, we still don’t have enough orders to keep the production line running every day.
 
I hope one day we’ll get more orders to keep the line busy, and then we can bring on a permanent supervisor or manager. And yeah, everyone will be swamped then.
 
Yeah, I think it’ll take some time, but I believe and hope we can get enough orders to run the production line every day. Fingers crossed.
 
Yeah, we’ve got plenty of projects, but most of them are still undergoing design and development. They haven’t moved into production yet.
We have an alcohol dispenser, a smart barbecue, a smart toothbrush, and also a smart lock. Plus we have a medical device. In short, we have lots of ongoing projects. But only a tiny number of them have made it to production.

路过

雷人

握手

鲜花

鸡蛋

Comment (0 comments)

facelist

You need to login to comment Login | Register

每周一篇英文日志,坚持一年,你的英语能力将发生质的飞跃!

DioEnglish.com --- A Nice Place to Practice English and Make New Friends!

English Writing, English Blog, English Diary, 英语角, 英语写作, 英文写作, 英语交流, 英语日记, 英语周记, 英文日记, 英语学习, 英语写作网, 英语作文大全

Website Rules|Contact Us|英文博客网 ( 京ICP备06064874号-2 )

GMT+8, 2026-11-17 07:30

英文博客网 - 英文写作网站与英语学习者交流社区

英语角 英语交流 英文写作 英语日记 英语写作网

Back to Top