Register Login
DioEnglish.com Return Index

Rosanna's Space http://www.dioenglish.com/?114322 [Favorites] [Copy] [Shares] [RSS]

Blogs

A horrible Weekend

499 views. 2019-6-18 14:13

Weekendis a word that usually makes me happy. The word brings back memories of Weekend morning get up late and spent watching films on television. Last weekend, unfortunately, almost changed the meaning of the word; it was a terrible day.

Every weekend we go to Pan Shan house to take care my plants, trees and my lovely flowers. At the spring of this year we bought a lot fresh flowers to decorate my courtyard. But Tiger gave me a big surprise that he wanted to install a lift in the room at this golden period of the year. Due to this year his waist was not good, he was a little worry he cannot be up to the floor in some day later. And his friend’s home has been done it at their third floor villa, that’s why Tiger has planned to follow him to install an elevator at our home. Even I did not agree he still insist to do so.

Anyway I was hardly to change his mind, just leave it like it I thought. As we expected the term of renovation will be last about one month. I have locked some rooms, and let living room and bed room was opened. After two weeks past, there was only digging a big hole at outside, the inside of the room was nothing happened, we was told that this was for waterproof, it must be waiting till it was dry, ok anyway I agree. And before starting renovation, the leader of worker promised me everything in the room should be covered, but the last weekend when we came to see it, there were many garbage and muck at the entrance of door, in the room some of furniture, curtains and printings on the wall were not covered, everywhere was dusty at the all.

At first I was so angry with Tiger to blame how come like it, let him to talk with the supplier to change the situation as soon as possible, otherwise my beautiful rooms will be destroy, Tiger was a kind man to talk with the organizer nicely, and He was only worry about the time limit of the project, I have to talk with supplier directly and strongly, let them to cover everything they can including carpet before starting it.

We were told that the time of project will have to wait other two weeks, these days I have seen some photos of the lift it looks not bad actually, I was a little at easy. Now I am really hope it will be a big surprise to show us. 


Comment (0 replies)

facelist doodle 涂鸦板

You need to login first Login | Register

每周一篇英文日志,坚持一年,你的英语能力将发生质的飞跃!

DioEnglish.com --- A Nice Place to Practice English and Make New Friends!

English Writing, English Blog, English Diary, 英语角, 英语写作, 英文写作, 英语交流, 英语日记, 英语周记, 英文日记, 英语学习, 英语写作网, 英语作文大全

Website Rules|Contact Us|茶文化|英文博客网 ( 京ICP备06064874号-2 )

GMT+8, 2024-4-20 06:51

Powered by DioEnglish.com

© 2008-2013 China English Blogs

Top