A lot of new products need to trial run on the production line these days. It really makes me so tired that I want to have a rest. During this period, everybody of manufactured technology department needs to be standby until the process of new products finished well. Meanwhile, all staffs need to work overtime ensure that everything goes well. Even some of the guys have to stay up late. It was always the same on these occasions. But that was not all. In most cases, there will be two or three steps should be finish after first batch trial running. A short while ago, however, we just finished a new product trial run. That’s why everybody felt tired within a short time. I do really hope the period of tough time passed by quickly.