I am not a night owl,but I often work at night,especially this sea shift.Many colleagues said that I was a hard cheese.I think so.hehe!
It was time to crew change and get back to platform,but I stayed at heliport for 4 days almost,Because of weather condition.When I just arrived at our platform,Our platform production shut down due to FPSO shutdown.I had to troubleshooting and recover production until the next night.so I felt deuced tired,my OIM let me sleep.Finally,I can rest without considerint other thing.
But good time do not last long,A heavy snowfall was coming after 2 days in Bohai sea area.A great deal of equipments was frozen.So my co-worker and I had to check and repair heat trace of equipments,pipes.We repair and troubleshooting heat trace day by day to prevent equipments frozen..
Today FPSO shut down again,we had to be busy.
This is my fist sea shift after my promotion.