|
1. Line up casing valve to choke manifold;
2. Open casing valve, bleed off any pressure through poor-boy;
3. Run in hole & engage tubing hanger retrieving tool;
4. Make up TIW, connect TD;
5. Open SCSSV, bleed off any pressure through poor-boy;
6. Fill hole flowline correct (with mud pump if big loss);
7. Small & master bushing locked;
8. Close BOP;
9. Limit personnel on rig floor & dog house;
10. Unset packer;
DioEnglish.com --- A Nice Place to Practice English and Make New Friends!
English Writing, English Blog, English Diary, 英语角, 英语写作, 英文写作, 英语交流, 英语日记, 英语周记, 英文日记, 英语学习, 英语写作网, 英语作文大全
Website Rules|Contact Us|茶文化|英文博客网 ( 京ICP备06064874号-2 )
GMT+8, 2024-5-19 10:21
Powered by DioEnglish.com
© 2008-2013 China English Blogs