|
1. Wash sand, handle returns, no Desander, Sand Trap, most have to pump to production flowline;
2. Control hole loss, take risk of blow out;
3. Set barriers with Slickline, test barriers from below;
4. High inclination, could not reverse circulation;
5. Use different jars: Link Jars (Speed required), Spring Jars (Pre-set, can be fired more than once when P/U), Hydraulic Jars (in Thick oil)
6. How to share slickline crew and equipment with other 5 rigs.
Note:
There are total of 12 orifice positions in OTSC Isolation Sleeve. (6 on top & bottom)
Orifice Diameter: 2~7 mm;
RIH slickline with OTSC test gauge in Isolation Sleeve (Orifice opend). It can get the formation pressure to confirm seals between Isolation Packer, Water Allocator Mandrel & Isolation Sleeve.
DioEnglish.com --- A Nice Place to Practice English and Make New Friends!
English Writing, English Blog, English Diary, 英语角, 英语写作, 英文写作, 英语交流, 英语日记, 英语周记, 英文日记, 英语学习, 英语写作网, 英语作文大全
Website Rules|Contact Us|茶文化|英文博客网 ( 京ICP备06064874号-2 )
GMT+8, 2024-5-19 10:08
Powered by DioEnglish.com
© 2008-2013 China English Blogs